SHARC II incorporates a 3He sorption fridge to cool the detectors to about 350 mK. This fridge must be cycled every day prior to the start of observing. The cycle takes a bit more than 90 min. Before cycling the fridge, please consult with the staff and any other observers about the weather forecast and the observing plan.
The 3He fridge is controlled electronically. Normally the staff will set up the controller and its software. To cycle the fridge:
Examples of the fridge monitor at the start, middle, and completion of the cycle.
The Neocera LTC-21 controller must be powered up, connected to the sharcii computer with a serial cable, and connected to the cryostat. Two processes must be running on sharcii for properly fridge cycling: a background server that controls the Neocera and logs temperatures and a graphical client. Only one server should be running but multiple clients can run at the same time. For simplicity, these are run in a detached (vnc) desktop.
Normally the staff staff will set up the controller and its software. To start or restart the fridge processes:
kilauea% ssh sharc@sharcii
sharcii% ps -ef | grep java
sharc 598 1 0 14:18:00 pts/0 0:03 /home/sharcii/sharc/j2sdk1.4.2_30/bin/java -Djava2d.font.usePlatformFont=true F sharc 600 1 0 14:18:14 pts/0 0:04 /home/sharcii/sharc/j2sdk1.4.2_30/bin/java -Djava2d.font.usePlatformFont=true G sharc 621 606 0 14:22:05 pts/1 0:00 grep java
sharcii% kill -9 PID
ps
listing. sharcii% cd ~/recycle
sharcii% cycle
10 Minutes;Both; 500;One Shot;0;
sharcii% gclient
Cycle logs are on sharcii in ~sharc/recycle/logs/. Temperatures can be read directly from the Neocera front panel near the instrument. The left temperature is a “charcoal pump” temperature (3He or 4He), which is normally 6.7 K except during a cycle. (For the pump temperature, there is a scale factor difference between the front panel and the cycle logs.) The right temperature is the detector temperature, which is normally 0.36 K in operation.
If a cycle hangs in a state where continuous heat is applied to the refrigerator, the heating can be stopped by pressing the Monitor button on the Neocera front panel.
Normally the initial cooldown is done many days in advanced to allow the detectors to passively cool to 4 K. During the cooldown, the detector temperature will be between 10 K and 100 K. If necessary, the cooldown may be accelerated by actively cooling the detectors. Active cooling uses more LHe than passive cooling. Run a “3He only” cycle then wait for the detector temperature to drop below 8 K. If one “3He only” cycle was not sufficient to cool the detectors below 8 K, try another one. Once the detectors are below 8 K, follow with a standard cycle.
In 2003 August and 2004 January, the first standard cycles ran succesfully, but the detector took several hours to cool below 0.4 K and the liquid 3He ran out prematurely. This problem disappeared by the next day. The best explanation is a poorly heat sunk component that causes a transient heat load on the 3He system. Performing the first 3He cycle as much as a day in advance is a suitable way to address this problem.
During the work week, the CSO staff handle cryogen service. Please consult the staff about the schedule and the plan for weekend and holiday service. Please service cryogens yourself only if you are trained by the staff and wear the proper safety equipment.
The LN2 reservoir must be filled at least every 48 h, i. e., at least every other day.
The LN2 fill port is in the middle of the cryostat.
To allow access for the funnel, position the telescope at a zenith angle of 45° (uip> za 45
).
The reservoir capacity is 7 liters and the usage is about one white pail per day.
SHARC II needs LHe every other day during active observing, i. e., when the 3He fridge is cycled. Otherwise, the LHe reservoir must be refilled every six days.
The LHe fill port is the one closest to the edge of the cryostat.
To allow access for the fill tube, position the telescope at a zenith angle of 45° (uip> za 45
).
The reservoir capacity is 11 liters.
The distance from the bottom of the reservoir to the exit hole is 20.5 in and the reservoir is 7 in deep.
Before the 3He fridge is cycled, the LHe depth should be at least 3 in.
Please replace the downward-pointed black rubber hose assembly after filling the LHe.
This helps prevent ice plugs.
In case of a suspected ice plug in the SHARC II LHe reservoir, CALL STAFF IMMEDIATELY FOR ASSISTANCE. Ice plugs can eventually result in a cryostat explosion.