Full 99 Channel
System build started in March 2001.
|
|
Complete build
and integration of Dish and System racks completed May 2002.
|
|
In June of 2002,
with only 14 toothpicks (in specific locations), an appreciable and
consistent improvement in signal power was observed using the 692 Rx.
|
|
Verified that
the DSOS is on its way!
|
|
|
|
(I am pleased to
report that it took 14 months to get a full 99 channel working system built
and running on the CSO. Under
the work conditions and summit environment, it is a very impressive
accomplishment.
|
|
I was told to
cease and desist all work in April 2002, one month before system buildup was
completed. The Director had to
get involved for the effort to continue.
|
|
After numerous
setbacks out of my control . . . I could not get system verification from
holography, thus the test with the 692Rx in June 2002.)
|
|
|
|
~Melanie Leong~
|